2024 Annual Report Draft
Infrastructure maintenance In 2024, Operational Services continued to make steady progress through proactive maintenance efforts, including water main flushing and roadway paving. At the same time, the team remained responsive to reactive maintenance needs, swiftly addressing issues such as potholes and water main leaks as they were discovered or reported.
Parks and green spaces
Utilities Type of asset
Type of asset
Totals
Totals 170 km
Trees planted in 2024
95
Sanitary sewer main
Total planted trees
4,837
Sanitary sewer connections
8,172
Naturally grown trees (estimate)
30,000
Sanitary lift stations
9
Mowed grass area
41.3 hectares
Pump stations
17
Trails (paved and unpaved)
37.5 km
Water main
173.4 km
Playgrounds Park benches Park buildings Picnic tables Footbridges
25
Water main connections
9027 3068
156
Water meter setters
21 56 31
Storm main
168.7 km
Storm connections (estimate)
7,478 4,379
Catch basins
Transportation
Type of asset
Totals
Courtenay's vast network of above- and below-ground infrastructure requires ongoing monitoring, maintenance and renewal. This includes essential services such as water, wastewater, storm and transportation networks, as well as parks, recreation and equipment. The estimated replacement value of these assets is over $1 billion.
Roads (total lane km)
171 km (356 lane km)
Sidewalks
181 km
Garbage cans Fire hydrants Street lights
159 833
1,572
Operational Services asset lifecycle activities by year
Activity
2020
2021
2022
2023
2024
Requests for service
2,206
2,202
2,106
2,804
2,533
Roadway paving (some multi-lane roads)
1.8 km (7.0 lane km)
543 m (1.1 lane km)
1.7 km (3.45 lane km)
2.7km (4.52 lane km)
1.9km (3.8 lane km)
Potholes repaired
301
200
321
487
665
Watermains flushed
21 km
19 km
N/A
56 km
39 km
Watermain breaks
3
3
5
7
3
Watermain leaks
20
33
81
98
78
City of Courtenay | 2024 Annual Report
44
Made with FlippingBook - Online catalogs